EV CHARGING PROS

Fast EV Charger Install

We check your site, plan the power, and install the right charger for homes, offices, and fleets. Elk Charge also handles permits, load limits, and repairs.

Low-angle EV charger install by a cedar house with rain, conduit, and SUV at dawn

Metric 01

250+

chargers installed

Metric 02

24 hrs

quote turnaround

Metric 03

4.8/5

client rating

HOW IT WORKS

Simple Four-Step Plan

We check power, panel space, parking, and the best charger spot.

White EV by an open service panel at a damp townhouse driveway, early-morning site assessment

2-3 day report

Site Assessment

From $499

We check power, panel space, parking, and the best charger spot.

Wall-mounted EV charger in a clean garage with conduit, breaker box, and docked cable.

1-2 day install

Home Charger Install

From $1,499

Two glowing EV charger pedestals under a retail canopy in a wet parking bay at blue hour.

3-5 day install

Commercial Charger Install

From $3,900

Dawn fleet depot row of EV charger pedestals beside parked electric vans in wet drizzle.
01Phased rollout

Fleet Charging Setup

From $7,500

Depot charger plans for vans, trucks, and service cars.

Load-management cabinet with breaker hardware and status lights in a utility alcove.
02Site power map

Load Management

From $1,200

We balance charger demand so your panel stays within safe limits.

Opened EV charger pedestal mid-repair on wet concrete, with parts tray and warm workshop light
03Same-week visits

Maintenance & Repairs

From $395

Troubleshooting, parts swaps, and fast return visits for failed chargers.

SERVICES

EV Charging Services For Every Site

We review your property, power panel, parking layout, and charger needs.

Clamp meter, flashlight, key fob, and closed notebook on a stone slab.
01

Book Site Check

We review your property, power panel, parking layout, and charger needs.

EV charger parts staged on plaster: conduit elbows, connector sample, ferrules, glands, and enclosure mockup.
02

Plan The Work

We pick the charger type, power path, and install scope before the job starts.

Top-down flatlay of permit tools: stamp, key, sealed envelope and file clip on limestone.
03

Handle Permits

We prepare permit forms, submit them, and keep the job moving with local rules.

Mounted EV charger faceplate with torque screwdriver, test plug, and coiled cable on concrete tray.
04

Install And Test

We finish wiring, mount the charger, test it, and show you how to use it.

CASE STUDIES

Real Jobs, Real Results

On-site power check Panel and wire review Charger model match Permit packet prep One follow-up call

One-time feeOne-time fee

Starter

From $499

  • On-site power check
  • Panel and wire review
  • Charger model match
  • Permit packet prep
  • One follow-up call
Most popularOne-time fee

Signature

From $1,899

  • Everything in Starter
  • Home or office install
  • Permit filing help
  • Breaker and wiring set
  • Full test and sign-off
  • Site cleanup
Per site planPer site plan

Scale

Custom

  • Multi-site power map
  • Fleet charger rollout
  • Load share setup
  • Project lead on call
  • Monthly service visits
  • Priority repair queue

WHAT CLIENTS SAY

Trusted By Owners And Managers

Permit approved and charger ready the day before keys changed

Finished townhome garage with EV charger, parked EV, fresh paint, and morning light

Residential

Townhome Garage Charger Before Move-In

Permit approved and charger ready the day before keys changed

Eight EV charger pedestals lit at dawn in a foggy office lot

Commercial

Office Lot Adds Eight Chargers

Macro of a plugged-in fleet van charge port beside a bollard and charger at dawn

Fleet

Fleet Yard Charges On Schedule

Two EV chargers beside planted islands and empty retail parking spaces in warm haze.

Retail

Retail Parking Gets Two Chargers

Six clean EV chargers with cyan status lights in a damp evening service court.

Property

Property Manager Cuts Down Repairs

Macro still life of a project manager’s coordination kit: tablet, brass ring, cable tags, and desk clock.

Site checks and permits

Maya Chen

Electrician tools arranged on a walnut bench under dramatic workshop light.

Panel work and installs

Jordan Blake

Miniature van, charging plug, telematics puck and lane markers on a fleet planning bench.

Depot layout and load plans

Priya Singh

Technician parts tray with contactor, gasket ring, terminal lugs, and flashlight on a clay workbench.

Testing and repair visits

Owen Carter

Proof

Customer notes

Verified

They checked our panel, handled permits, and finished the home charger in one visit.

Macro still life of a project manager’s coordination kit: tablet, brass ring, cable tags, and desk clock.

Nina Patel

Homeowner, Seattle

Verified

Our office lot now has four chargers, and staff can plug in before shifts.

Electrician tools arranged on a walnut bench under dramatic workshop light.

Caleb Moore

Facilities Lead, North Shore Office Park

Verified

Elk Charge set up our fleet yard, and morning dispatch is much easier now.

Miniature van, charging plug, telematics puck and lane markers on a fleet planning bench.

Tanya Ross

Operations Manager, Metro Freight

Service area

Seattle Metro

Seattle, Bellevue, Renton, Kent, Shoreline

Seattle skyline with Space Needle above wet waterfront and ferry slips at sunset, hazy and calm

Area 01

Seattle Metro

Seattle, Bellevue, Renton, Kent, Shoreline

Bellevue Eastside skyline over a calm lake at golden hour, with evergreen shoreline and haze.

Area 02

Eastside

Bellevue, Redmond, Kirkland, Issaquah, Sammamish

South Sound waterfront with bridge, port and misty mountain shoulder at sunrise

Area 03

South Sound

Tacoma, Lakewood, Puyallup, Federal Way, Olympia

Misty Portland skyline above the Willamette River at golden hour, with calm open water for copy.

Area 04

Portland Area

Portland, Beaverton, Hillsboro, Gresham, Vancouver

The Map

Questions

Common Questions

Quick answers before visitors choose a product, service, or next step.

01How long does a site check take?+

Most site checks take 60 to 90 minutes. We look at power, panel space, parking layout, and the charger spot.

02Do you handle permits?+

Yes. We prepare permit forms, submit the set, and keep the job moving with the local rules in mind.

03Can you install at a home?+

Yes. We install Level 2 home chargers, check the panel, and finish the wiring, testing, and handoff.

04Do you work with fleets?+

Yes. We plan depot layouts, match power use to each site, and set chargers for vans, trucks, and cars.

05What if a charger stops?+

We fix faults, replace worn parts, and test the unit so homes, offices, and managed sites stay online.

06Which areas do you serve?+

We serve Seattle, the Eastside, South Sound, and Portland area sites with on-site visits and installs.

Charge Site Notes

Get short notes on charger picks, permit steps, load limits, and repair care for EV sites.