Metric 01
250+
chargers installed
EV CHARGING PROS
We check your site, plan the power, and install the right charger for homes, offices, and fleets. Elk Charge also handles permits, load limits, and repairs.

Metric 01
chargers installed
Metric 02
quote turnaround
Metric 03
client rating
HOW IT WORKS
We check power, panel space, parking, and the best charger spot.

2-3 day report
From $499
We check power, panel space, parking, and the best charger spot.

1-2 day install
From $1,499

3-5 day install
From $3,900

From $7,500
Depot charger plans for vans, trucks, and service cars.

From $1,200
We balance charger demand so your panel stays within safe limits.

From $395
Troubleshooting, parts swaps, and fast return visits for failed chargers.
SERVICES
We review your property, power panel, parking layout, and charger needs.




CASE STUDIES
On-site power check Panel and wire review Charger model match Permit packet prep One follow-up call
From $499
From $1,899
Custom
WHAT CLIENTS SAY
Permit approved and charger ready the day before keys changed

Residential
Permit approved and charger ready the day before keys changed

Commercial

Fleet

Retail

Property

Site checks and permits

Panel work and installs

Depot layout and load plans

Testing and repair visits
Proof
“They checked our panel, handled permits, and finished the home charger in one visit.”

Nina Patel
Homeowner, Seattle
“Our office lot now has four chargers, and staff can plug in before shifts.”

Caleb Moore
Facilities Lead, North Shore Office Park
“Elk Charge set up our fleet yard, and morning dispatch is much easier now.”

Tanya Ross
Operations Manager, Metro Freight
Service area
Seattle, Bellevue, Renton, Kent, Shoreline

Area 01
Seattle, Bellevue, Renton, Kent, Shoreline

Area 02
Bellevue, Redmond, Kirkland, Issaquah, Sammamish

Area 03
Tacoma, Lakewood, Puyallup, Federal Way, Olympia

Area 04
Portland, Beaverton, Hillsboro, Gresham, Vancouver
Journal

Questions
Quick answers before visitors choose a product, service, or next step.
Most site checks take 60 to 90 minutes. We look at power, panel space, parking layout, and the charger spot.
Yes. We prepare permit forms, submit the set, and keep the job moving with the local rules in mind.
Yes. We install Level 2 home chargers, check the panel, and finish the wiring, testing, and handoff.
Yes. We plan depot layouts, match power use to each site, and set chargers for vans, trucks, and cars.
We fix faults, replace worn parts, and test the unit so homes, offices, and managed sites stay online.
We serve Seattle, the Eastside, South Sound, and Portland area sites with on-site visits and installs.
Get short notes on charger picks, permit steps, load limits, and repair care for EV sites.